This approach is based on methodology that seeks to understand the hazards to which the structure is exposed, the possible consequences of these and how these should be mitigated. This includes ensuring that suitable safety measures (often called barriers) to protect against the hazards turning into unfavourable consequences are established and maintained throughout the life of the facility. A key element of the major hazard and barrier management regimes is the prioritisation of activities, including inspection and repair for the important safety systems and barriers. Several standards and reports have been published on the principles of SIM, such as HSE RR684 (HSE 2009). These identify a number of key processes which are considered good practice in SIM, together with an appropriate management scheme and documentation.

      Inspection is a key element of the surveillance activities and will include in‐service inspection of the structure to identify deterioration, degradation and damage. The process of identifying such anomalies will often be the most extensive and costly part of the surveillance activity (both strategy and programme).

      Repair is the necessary mitigation activities in order to retain the safety of the structure if inspection has revealed anomalies of significant concern. The repair method of choice is typically based on output from a structural evaluation or assessment.

      Several standards have recently been developed to guide the operators of floating facilities in their integrity management including inspection, such as ISO 19904‐1 section 18 (ISO 2006) and NORSOK N‐005 appendices F, G, H and I (Standard Norge 2017b). Further, a document prepared by Oil & Gas UK (O&GUK 2014) on the management of ageing and life extension for floating production installations provides detailed information relevant for inspection of ageing floating installations. Inspection features as a key control measure in managing the ageing mechanisms such as fatigue and corrosion, although little detail is given on the actual recommended inspection tools and technique. The main topics in the Oil & Gas UK (O&GUK 2014) are the integrity management and inspection of:

       hull (structural and watertight integrity);

       marine system, including ballast system, control system, cargo system, inert gas system and marine utilities (pumps, generators, etc.);

       station‐keeping systems (mooring and DP).

      NORSOK N‐005 (Standard Norge 2017b) builds upon this Oil & Gas UK (O&GUK 2014) report, breaks down the non‐structural systems into a number of components and identifies whether inspection based on class rules or based on generally accepted maintenance standards such as NORSOK Z‐008 (Standard Norge 2011) is appropriate.

      Standards and recommended practices for SIM are given in API RP‐2SIM (API 2014b), API RP‐2FSIM (API 2019a), API RP‐2MIM (API 2019b), ISO 19902 (ISO 2007), ISO 19901‐9 (ISO 2019a), NORSOK N‐005 (Standard Norge 2017b) and HSG65 (HSE 2013). These do to a large extent include the SIM process described above.

      

      2.3.2 API RP‐2A and API RP‐2SIM (Structural Integrity Management)

Interval years for manned platforms Interval years for unmanned platforms
Level I inspectionEffectiveness of CP systemAbove water visual survey In the event of suspected underwater damage, a level 2 survey was stated to be required. Annual Annual
Level II inspectionGeneral underwater visual surveyDamage surveyDebris surveyMarine growth surveyScour surveyAnode surveyCathodic potential The detection of significant structural damage is stated to be the basis for a level 3 survey. 3–5 years 5–10 years
Level III inspectionVisual inspection of preselected areas or areas with known or suspected damageCleaning of marine growth The detection of significant structural damage is stated to require a level 4 survey 6–10 years 11–15 years
Level IV inspectionUnderwater NDT of preselected areas or areas with known or suspected damageDetailed inspection and measurement of damaged area Dependant on outcome of level III inspection Dependant on outcome of level III inspection

      The RP builds upon the required survey intervals as shown in Table 1 and includes a simplified risk‐based methodology for inspection planning. Further, the RP details engineering practices for the evaluation, assessment and inspection of existing fixed offshore structures to demonstrate their fitness‐for‐purpose.

Schematic illustration of main SIM process of API RP 2SIM (API 2014b) and follow-on steps.

      Source: Modified from API (2014b), API RP‐2SIM Recommended Practice for Structural Integrity Management of Fixed Offshore Structures, American Petroleum Institute, 2014.

      The RP requires a baseline underwater inspection to be undertaken to determine the as‐installed platform condition. The baseline underwater inspection should include a visual survey of the platform for structural damage and the presence and condition of anodes and installed appurtenances. Further, the RP requires routine underwater inspections to be conducted to provide the information necessary to evaluate the condition of the platform and appurtenances. A plan for these routine inspections, depending on the risk evaluation, is provided in API RP‐2SIM (API 2014b) giving the intervals and scope for the inspections, the tools and techniques to be used and the methods of deployment.